Analysis of operation and maintenance cost flood handling system of Badung River

0Citations
Citations of this article
8Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

All of Badung River with a wide width of 10-40 meters is a typical urban river that has very important meaning to the flood handling system in the Denpasar City area. The results showed that the buildings on the Badung River included 2 trash racks, 1 rubber dam, 2 movable weirs and a 42 km long river wall with an average height of 3-5 m. The flood handling system has been carried out with control of the existing discharge through motion weirs and rubber weirs. While reducing waste that can cause flooding is done by building garbage filters. From the results of the analysis the operating and maintenance costs indicate the cost of routine inspection of 57,772,800 IDR/year, routine search fees of 27,936,000 IDR/year, additional eviction fees of 100,550,400 IDR/year, monitoring and evaluation costs 27,360,000 IDR/year, flood material costs 7,240,000 IDR/year, routine operations and maintenance of 3,306,067,750 IDR/years, the need for periodic fees every 5 years is 2,200,000,000 IDR and the cost of dredging sediments and river stone repairs amounting to 1,113,566,000 IDR every five years.

Cite

CITATION STYLE

APA

Mudhina, M., Parwita, I. G. L., & Yasada, G. (2020). Analysis of operation and maintenance cost flood handling system of Badung River. In Journal of Physics: Conference Series (Vol. 1450). Institute of Physics Publishing. https://doi.org/10.1088/1742-6596/1450/1/012020

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free