Analyzing the potential and the load evaluation on Ubrug hydro power plant of Sukabumi, West Java

1Citations
Citations of this article
6Readers
Mendeley users who have this article in their library.

Abstract

Built in 1923, the Ubrug Hydro Power Plant in Sukabumi was set up with an installed power of 5,94 MW on 1st unit and 2nd unit and 6,48 MW on the 3rd unit resulting in sum total of 18,36 MW. However, at present, the actual total power only generates 15,045 MW, a smaller number than its initial capacity, due to the lack of water discharge. Based on the measurement data, the load of the generator has experienced a decrease of power in normal field operation with a peak load of 9,5 MW and the lowest of 6 MW. On daily operations, only 2 generators are being operated, leaving the 3rd generator unoperated. This is due to the aging hydroelectric power plant on the location and the transition of forest functions in the upstream area, that serves as water absorption, to settlements of residents, and industrial estates. The other and the most salient cause is the waste carried by the Cicatih River coming along with the flow of water in the conduit.

Cited by Powered by Scopus

INCREASING FLEXIBILITY OF THE NATIONAL ENERGY SYSTEM BY BUILDING UP HYDRO PUMPED STORAGE PLANTS

0Citations
N/AReaders
Get full text

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Cite

CITATION STYLE

APA

Notosudjono, D., Wismiana, E., Alamsyah, F., & Ramadhon, B. D. (2018). Analyzing the potential and the load evaluation on Ubrug hydro power plant of Sukabumi, West Java. In MATEC Web of Conferences (Vol. 154). EDP Sciences. https://doi.org/10.1051/matecconf/201815401043

Readers' Seniority

Tooltip

PhD / Post grad / Masters / Doc 1

50%

Researcher 1

50%

Readers' Discipline

Tooltip

Chemical Engineering 1

25%

Environmental Science 1

25%

Computer Science 1

25%

Engineering 1

25%

Save time finding and organizing research with Mendeley

Sign up for free