This research is focused on the Phase I SABC milling circuit of the Wushan porphyry copper mine. Improvements to the existing circuit were targeted without any significant alterations to existing equipment or the SABC circuit. JKSimMet simulations were used to test various operating and design conditions to improve the comminution process. Modifications to the SABC comminution circuit included an increase in the SAG mill ball charge from 8% to 10% v/v; an increase in the mill ball charge from 23% v/v to 27% v/v; an increase in the maximum operating power draw in the ball mill to 5800 kW; the replacement of the HP Series pebble crusher with a TC84 crusher; and the addition of a pebble bin. Following these improvements, an increase in circuit throughput, a reduction in energy consumption, and an increase in profitability were obtained.
CITATION STYLE
Zhang, W. (2016). Optimizing performance of SABC comminution circuit of the wushan porphyry copper mine—a practical approach. Minerals, 6(4). https://doi.org/10.3390/min6040127
Mendeley helps you to discover research relevant for your work.