Status of the european elt

6Citations
Citations of this article
3Readers
Mendeley users who have this article in their library.
Get full text

Abstract

The EELT project is in Phase B (detailed design), a 3-year, 57.2 M Euro activity that is scheduled to conclude in a Proposal for Construction by end 2009 or early 2010. The starting point for the current phase was a community process leading to the convergence of earlier concepts into a single European project. The telescope baseline is for a fully steerable 42 m, segmented primary, 5 mirror design, fully adaptive system with Nasmyth and Coudé foci. This paper reports on the status of the EELT Phase B.

Cite

CITATION STYLE

APA

Gilmozzi, R., & Spyromilio, J. (2009). Status of the european elt. In Astrophysics and Space Science Proceedings (Vol. 0, pp. 217–223). Springer Science and Business Media B.V. https://doi.org/10.1007/978-1-4020-9190-2_37

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free