Aiming at the shortage of conventional BP algorithm, a BP neural net works improved by L-M algorithm is put forward. On the basis of the network, a Prediction model for 305 day's milk productions was set up. Traditional methods finish these data must spend at least 305 days, But this model can forecast first-breed dairy's 305 days milk production ahead of 215 days. The validity of the improved BP neural network predictive model was validated through the experiments. © 2010 IFIP International Federation for Information Processing.
CITATION STYLE
Wei, X., Qi, G., Shen, W., & Jian, S. (2010). Using L-M BP algorithm forecase the 305 days production of first-breed dairy. In IFIP Advances in Information and Communication Technology (Vol. 317, pp. 359–363). Springer New York LLC. https://doi.org/10.1007/978-3-642-12220-0_52
Mendeley helps you to discover research relevant for your work.