This paper investigates the impacts on floods of hypothetical changes to river channel geometry by construction or removal of embankments to prevent water spreading onto the floodplain at high flows. A numerical model is applied to the River Cherwell between Oxford and Banbury to simulate changes to flood hydrographs. Embanking the river increases the peak flows downstream by 50-150%. Restoring the river channel through the floodplain to pre-engineered dimensions reduces peak flow by around 10-15% and increases peak water levels within the floodplain by 0.5-1.6m. These results suggest that floodplain rehabilitation, in terms of embankment removal or returning the channel to pre-engineered dimensions, can be a valuable part of the flood management strategy of a catchment. Both measures lead to increased inundation of the floodplain, which can be positive for ecological restoration.
CITATION STYLE
Acreman, M. C., Riddington, R., & Booker, D. J. (2003). Hydrological impacts of floodplain restoration: A case study of the River Cherwell, UK. Hydrology and Earth System Sciences, 7(1), 75–85. https://doi.org/10.5194/hess-7-75-2003
Mendeley helps you to discover research relevant for your work.