Voltage measurements over the CAM-1 submarine cable between Madeira Island and Portugal mainland

6Citations
Citations of this article
5Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

Data of electrical voltage measured between the ends of the CAM-1 cable, during fifteen months, have been analysed in order to determine the electrical stability of the cable and to obtain some preliminary information related to water transport. The monthly average of the potential measured during days with low geomagnetic activity suggests a periodicity of 120 days that was tentatively interpreted as having origin in water flow. These results show a small trend that is compatible with no drift in the cable. The mean electric field estimated from quiet days is 0.206 ±0.022 mV/km. If the variations of this potential are attributable to ocean water transport a total water flow of ±0.09 cm/s is estimated. This value represents a maximum value for temporal variations of the spatially averaged water-flow velocity. © 2002, The Seismological Society of Japan, Society of Geomagnetism and Earth, Planetary and Space Sciences, The Volcanological Society of Japan, The Geodetic Society of Japan, The Japanese Society for Planetary Sciences. All rights reserved.

Cite

CITATION STYLE

APA

Monteiro Santos, F., Soares, A., Trindade, L., Nolasco, R., Rodrigues, H., & ISO-3D team. (2002). Voltage measurements over the CAM-1 submarine cable between Madeira Island and Portugal mainland. Earth, Planets and Space, 54(4), 393–398. https://doi.org/10.1186/BF03352428

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free