Research on the Non-constant Navigable Water Flow Conditions of the River Channel Downstream of the Navigable Facilities of Baise Water Control Project

0Citations
Citations of this article
1Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

The exit of Baise ship lift on the Right River is only about 700 m away from Dongsun Hydropower Station. Its dispatching operation, especially the unsteady flow, has a direct impact on the navigable water flow conditions of the approach channel gate area and river channel downstream of the Baise ship lift. According to some characteristics of Baise Junction and Dongsun Junction and the measured topography of Baoai River, a plane two-dimensional numerical model of the research river section is constructed, and the water flow changes in the mouth area under different working conditions are simulated and calculated. The research results show that the safety of navigation in the entrance area can be guaranteed from two aspects: optimizing the operation mode of the Baise and Dongsun cascade hydropower stations, and rationally formulating the downstream ship navigation management mode. Under the operating conditions of the four units of Baise Power Station, it is recommended that the ship wait for 0.5 h after the two units in Dongsun are started, so as to avoid the maximum water level increase period in the first half hour.

Cite

CITATION STYLE

APA

Guan, M., Zhang, M., Han, C., Qing, L., & Hang, Y. (2023). Research on the Non-constant Navigable Water Flow Conditions of the River Channel Downstream of the Navigable Facilities of Baise Water Control Project. In Lecture Notes in Civil Engineering (Vol. 264 LNCE, pp. 1522–1534). Springer Science and Business Media Deutschland GmbH. https://doi.org/10.1007/978-981-19-6138-0_135

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free