Determining the priority criteria and ranking of provincial bridge maintenance in West Sumatra using a combination of the Fuzzy Analytical Hierarchy Process and VIKOR-Modification methods

6Citations
Citations of this article
16Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

There are many bridges that need to be maintained in a provincial road network, with limited funds for bridge maintenance, many bridge criteria (average daily traffic, economic benefits, fund budget, technical conditions, bridge hierarchy, spatial planning, flood potential, type of damage, erosion potential, age and surface concrete, etc.), and various levels of conditions, are a number of criteria that are taken into account in the decision making by the government as an institution responsible for the functioning of roads and bridges. The selection of bridge maintenance priorities in West Sumatra Province was decided through a coordination meeting between agencies, and sometimes relatively without going through sufficient technical analysis. This research initiated, the selected criteria to be taken into consideration, the order of the important criteria in the selected network segment. This study involved a number of road and bridge maintenance experts at the Ministry of Public Works, Road and Bridge Research and Development Institutions, as well as the Department of Public Works and Spatial Planning of West Sumatra Province. A combination of Fuzzy Analytic Hierarchy Process (to determine weighted criteria) and VIKOR-Modification methods (to determine the order of choice of bridges to be handled) are selected. There are eight criteria that can be used in determining the priority of bridge maintenance, and the priority sequence of the most important are: bridge technical conditions, aging of the bridge, average daily traffic, economic benefits, road function, budget, disaster risk (Flood, Landslides, Tsunamis) and Spatial Plans.

References Powered by Scopus

Applications of the extent analysis method on fuzzy AHP

3895Citations
N/AReaders
Get full text

Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS

3746Citations
N/AReaders
Get full text

Multicriteria renewable energy planning using an integrated fuzzy VIKOR & AHP methodology: The case of Istanbul

605Citations
N/AReaders
Get full text

Cited by Powered by Scopus

Integrative Evolutionary-Based Method for Modeling and Optimizing Budget Assignment of Bridge Maintenance Priorities

10Citations
N/AReaders
Get full text

Determining the Best Graduation Using Fuzzy AHP

9Citations
N/AReaders
Get full text

An Invasive Weed Optimization-Based Fuzzy Decision-making Framework for Bridge Intervention Prioritization in Element and Network Levels

4Citations
N/AReaders
Get full text

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Cite

CITATION STYLE

APA

Yossyafra, Angelia, N., Yosritzal, Meyadtri, & Mazni, D. I. (2019). Determining the priority criteria and ranking of provincial bridge maintenance in West Sumatra using a combination of the Fuzzy Analytical Hierarchy Process and VIKOR-Modification methods. In IOP Conference Series: Materials Science and Engineering (Vol. 602). Institute of Physics Publishing. https://doi.org/10.1088/1757-899X/602/1/012105

Readers over time

‘19‘20‘21‘22‘23‘2402468

Readers' Seniority

Tooltip

Lecturer / Post doc 2

50%

PhD / Post grad / Masters / Doc 1

25%

Researcher 1

25%

Readers' Discipline

Tooltip

Engineering 2

50%

Biochemistry, Genetics and Molecular Bi... 1

25%

Business, Management and Accounting 1

25%

Save time finding and organizing research with Mendeley

Sign up for free
0