Monitoring the rapid-moving reactivation of earth flows by means of GB-InSAR: The April 2013 Capriglio Landslide (Northern Appennines, Italy)

37Citations
Citations of this article
45Readers
Mendeley users who have this article in their library.

Abstract

This paper presents the main results of the GB-InSAR (ground based interferometric synthetic aperture radar) monitoring of the Capriglio landslide (Northern Apennines, Emilia Romagna Region, Italy), activated on 6 April 2013. The landslide, triggered by prolonged rainfall, is constituted by two main adjacent enlarging bodies with a roto-translational kinematics. They activated in sequence and subsequently joined into a large earth flow, channelizing downstream of the Bardea Creek, for a total length of about 3600 m. The displacement rate of this combined mass was quite high, so that the landslide toe evolved with velocities of several tens of meters per day (with peaks of 70-80 m/day) in the first month, and of several meters per day (with peaks of 13-14 m/day) from early May to mid-July 2013. In the crown area, the landslide completely destroyed a 450 m sector of provincial roadway S.P. 101, and its retrogression tendency exposed the villages of Capriglio and Pianestolla, located in the upper watershed area of the Bardea Creek, to great danger. Furthermore, the advancing toe seriously threatened the Antria bridge, representing the "Massese" provincial roadway S.P. 665R transect over the Bardea Creek, the only strategic roadway left able to connect the above-mentioned villages. With the final aim of supporting local authorities in the hazard assessment and risk management during the emergency phase, on 4 May 2013 aerial optical surveys were conducted to accurately map the landslide extension and evolution. Moreover, a GB-InSAR monitoring campaign was started in order to assess displacements of the whole landslide area. The versatility and flexibility of the GB-InSAR sensors allowed acquiring data with two different configurations, designed and set up to continuously retrieve information on the landslide movement rates (both in its upper slow-moving sectors and in its fast-moving toe). The first acquisition mode revealed that the Capriglio and Pianestolla villages were affected by minor displacements (at an order of magnitude of a few millimeters per month). The second acquisition mode allowed to acquire data every 28 seconds, reaching very high temporal resolution values by applying the GB-InSAR technique.

References Powered by Scopus

The Varnes classification of landslide types, an update

2496Citations
N/AReaders
Get full text

Synthetic aperture radar interferometry

2313Citations
N/AReaders
Get full text

Satellite radar interferometry: Two‐dimensional phase unwrapping

2250Citations
N/AReaders
Get full text

Cited by Powered by Scopus

Landslide prediction, monitoring and early warning: a concise review of state-of-the-art

287Citations
N/AReaders
Get full text

Landslide detection, monitoring and prediction with remote-sensing techniques

221Citations
N/AReaders
Get full text

Remote sensing of landslides-A review

180Citations
N/AReaders
Get full text

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Cite

CITATION STYLE

APA

Bardi, F., Raspini, F., Frodella, W., Lombardi, L., Nocentini, M., Gigli, G., … Casagli, N. (2017). Monitoring the rapid-moving reactivation of earth flows by means of GB-InSAR: The April 2013 Capriglio Landslide (Northern Appennines, Italy). Remote Sensing, 9(2). https://doi.org/10.3390/rs9020165

Readers' Seniority

Tooltip

PhD / Post grad / Masters / Doc 13

50%

Researcher 7

27%

Professor / Associate Prof. 5

19%

Lecturer / Post doc 1

4%

Readers' Discipline

Tooltip

Earth and Planetary Sciences 11

44%

Engineering 10

40%

Arts and Humanities 2

8%

Business, Management and Accounting 2

8%

Article Metrics

Tooltip
Social Media
Shares, Likes & Comments: 28

Save time finding and organizing research with Mendeley

Sign up for free