A reactor winding has been damaged due to induction of resonance voltages on the de-energized circuit of two parallel 230 kV shunt compensated lines between Zahedan and Iranshahr. The phenomenon is modeled in PSCAD and the safe range of shunt compensation is derived. In this study the effect of various faults on the lines, the reactor saturation and corona dissipation are considered and the results are compared to the electrostatic no-loss method results. Various ways are examined for damping the resonance condition and the best solution is chosen.
CITATION STYLE
Samimi, M. H., Abedini, M., Mostajabi, A. H., Farokhzad, D., Ayoubzadeh, H., Akmal, A. A. S., & Mohseni, H. (2014). Reactor failure due to resonance in Zahedan-Iranshahr parallel EHV lines, analysis and practical solutions. Acta Polytechnica Hungarica, 11(1), 63–78. https://doi.org/10.12700/aph.11.01.2014.01.5
Mendeley helps you to discover research relevant for your work.