Startup, commissioning and operation of Fenyi 100MW CFB boiler

2Citations
Citations of this article
4Readers
Mendeley users who have this article in their library.
Get full text

Abstract

The first 100MW CFB boiler, designed by the Thermal Power Research Institute and manufactured by Harbin Boiler Company Limited, has been successfully running in Jiangxi Fenyi Power Plant since 2003. Local high ash content anthracite and lean coal that are very difficult to burn out are used in the 100 MW CFB boiler. The results of the 100MW CFB boiler shows that the CFB boiler can run in 30% MCR and startup with two under bed burners, and the boiler efficiency higher than 88% can be got after the combustion modification test. The CFB boiler can be operated with full load and reaches design parameters. The emissions of NO, N2O and CO are less than 70mg/m3, 30mg/m3, and 125mg/m3, respectively, and SO2 less than 400mg/m3 after limestone injection. The bottom ash temperature from bed ash coolers is less than 120°C after its modification. Coal blockage at the coal storage silo is the main problem influencing the CFB boiler continuous operation. The running experiences for 5 years proved that the CFB boiler performance is successful, and the results were applied in 210 MW and 330 MW CFB Boiler design of Fenyi Power Plant.

Cite

CITATION STYLE

APA

Wang, Z., Yu, W., & Bo, S. (2009). Startup, commissioning and operation of Fenyi 100MW CFB boiler. In Proceedings of the 20th International Conference on Fluidized Bed Combustion (pp. 137–142). SpringerOpen. https://doi.org/10.1007/978-3-642-02682-9_15

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free