Identifying and measuring Engineering, Procurement, and Construction (EPC) key performance indicators and management strategies

46Citations
Citations of this article
180Readers
Mendeley users who have this article in their library.

Abstract

Delay and cost overrun in construction projects are two widespread problems that arouse practitioners' and scholars' concern. Therefore, the objective of this study was to identify Key Performance Indicators (KPIs) in each of Engineering, Procurement and Construction (EPC) phases separately and then calculate the weight impact that is associated with each of identified KPIs. Additionally, this study aimed to find the most appropriate Best Practices (BPs) for the identified phase-based indicators. Through a review of existing literature, a survey was developed to collect data from the completed construction projects. Various statistical methods, including two sample T-test and Kruskal-Wallis test, were utilized to analyze the data. Subsequently, Epsilon-Squared effect size method was applied to prioritize the identified KPIs. Since the lack of communication and slowness in decision making were found as the primary schedule Performance Indicators, schedule performance was identified to be highly affected by managerial approaches and actions. In addition, clients play a decisive role, because owner-driven change orders were found as the most crucial cost performance indicator affecting the performance of the engineering and construction phases. The outcome of this study helps practitioners and scholars to understand the phase-based cost and schedule KPIs, and appropriate mitigating strategies to improve the construction performance in EPC phases and save time and money.

References Powered by Scopus

Project management: Cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria

1526Citations
N/AReaders
Get full text

Causes of delay in large construction projects

1122Citations
N/AReaders
Get full text

Causes and effects of delays in Malaysian construction industry

920Citations
N/AReaders
Get full text

Cited by Powered by Scopus

A modified particle swarm optimization for risk assessment and claim management in engineering procurement construction projects

17Citations
N/AReaders
Get full text

Statistical Analysis of Delay-Causing Factors in Indian Highway Construction Projects under Hybrid Annuity Model

16Citations
N/AReaders
Get full text

An evaluation of project risk dynamics in sino-africa public infrastructure delivery; a causal loop and interpretive structural modelling approach (ISM-CLD)

16Citations
N/AReaders
Get full text

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Cite

CITATION STYLE

APA

Habibi, M., Kermanshachi, S., & Rouhanizadeh, B. (2019). Identifying and measuring Engineering, Procurement, and Construction (EPC) key performance indicators and management strategies. Infrastructures, 4(2). https://doi.org/10.3390/infrastructures4020014

Readers' Seniority

Tooltip

PhD / Post grad / Masters / Doc 53

82%

Lecturer / Post doc 6

9%

Professor / Associate Prof. 3

5%

Researcher 3

5%

Readers' Discipline

Tooltip

Engineering 44

75%

Business, Management and Accounting 7

12%

Social Sciences 5

8%

Arts and Humanities 3

5%

Article Metrics

Tooltip
Mentions
Blog Mentions: 1

Save time finding and organizing research with Mendeley

Sign up for free