Quality and time are two important things that are interrelated in a construction project. In the development of an elite area, namely Green Junction Citraland Surabaya, quality and time are priorities in its implementation. The right time and the right quality of work are the determining factors for the success of the project. However, there is always a risk of construction that can result in delays and low quality, therefore, identification of factors causing the delay and low quality is carried out with quantitative analysis methods. This study discusses the main factors that have delays and the low quality of results. This research was conducted by distributing questionnaires with respondents who then conducted by descriptive test (Ranking) to get the main factors. From the results of the study stated by the main factors influencing the delay in the work such as, frequently changes in work, low productivity, qualifications of employees not in accordance with their fields, and low quality of materials. While the main factors that affect the low quality of work such as communication and coordination between divisions, reducing the workforce trained, the use of equipment is less efficient, changes in work during implementation, understanding faster construction methods and work accidents.
CITATION STYLE
Alrizal, F. F., Choiriyah, S., & Adi Saputro, L. E. (2020). Identifikasi Faktor Penyebab Keterlambatan Waktu dan Mutu Pekerjaan pada Proyek Ruko (Rumah Toko) Green Junction Citraland. Jurnal IPTEK, 24(1), 53–58. https://doi.org/10.31284/j.iptek.2020.v24i1.901
Mendeley helps you to discover research relevant for your work.