Regarding nuclear power plant development in Bangka Island, it can be estimated that produced power will be oversupply for the Bangka Island and needs to transmit to Sumatra or Java Island. The distance between the regions or islands causing considerable loss of power in transmission by alternating current, and a wide range of technical and economical issues. The objective of this paper addresses to economics analysis of direct current transmission system to overcome those technical problem. Direct current transmission has a stable characteristic, so that the power delivery from Bangka to Sumatra or Java in a large scale efficiently and reliably can be done. HVDC system costs depend on the power capacity applied to the system and length of the transmission line in addition to other variables that may be different.
CITATION STYLE
Liun, E., & Suparman. (2014). Cost estimation of HVDC transmission system of Bangka’s NPP candidates. In AIP Conference Proceedings (Vol. 1615, pp. 162–166). American Institute of Physics Inc. https://doi.org/10.1063/1.4895879
Mendeley helps you to discover research relevant for your work.