Analisis Produktivitas Hydraulic Static Pile Driver Pada Pembangunan Apartemen Victoria Square Tower B Tangerang Banten

  • Hakim A
  • Akbar A
N/ACitations
Citations of this article
77Readers
Mendeley users who have this article in their library.

Abstract

Abstrak Dalam membangun suatu konstruksi apartemen diperlukan perhatian dalam pelaksanaan konstruksinya, terutama pada pekerjaan pemancangan. Lokasi pembangunan Apartemen Victoria Square Tower B Tangerang Banten terletak di lingkungan perumahan dan memiliki keterbatasan ruang gerak, sehingga diperlukan solusi terkait pengerjaan pemancangan tersebut agar tidak menimbulkan getaran/kebisingan terhadap lingkungan sekitar. Dalam studi kasus pembangunan Apartemen Victoria Square Tower B Tangerang Banten, metode pemancangan yang digunakan adalah menggunakan alat Hydraulic Static Pile Driver. Jenis-jenis pekerjaan pada pemancangan tersebut terdiri dari Move to The Point, Lifting Pile, Clamping & Piling, Joint Pile (Welding), Dolly, dan Cutting Pile. Hasil analisis deskriptif pada penelitian ini didapat nilai produksi alat Hydraulic Static Pile Driver terendah adalah 0.225 meter/menit atau setara 13.5 meter/jam dan nilai produksi tertinggi adalah 1.364 meter/menit atau setara 82 meter/jam. Abstract In building an apartment construction requires attention in the construction implementation, especially in the erection work. The construction location of Victoria Square Apartment Tangerang Tower B Banten is located in a residential area and has limited mobility, so a solution related to the erection work is needed so as not to cause vibration/noise to the surrounding environment. In the case study of the construction of the Victoria Square Tower B Tangerang Banten Apartment, the erection method used was using a Hydraulic Static Pile Driver. The types of work in the erection consist of Move to The Point, Lifting Pile, Clamping & Piling, Joint Pile (Welding), Dolly, and Cutting Pile. The results of the descriptive analysis in this study obtained the lowest production value of Hydraulic Static Pile Driver is 0.225 meters/minute or equivalent to 13.5 meters/hour and the highest production value is 1.364 meters/minute or equivalent to 82 meters/hour.

Cite

CITATION STYLE

APA

Hakim, A. R., & Akbar, A. (2018). Analisis Produktivitas Hydraulic Static Pile Driver Pada Pembangunan Apartemen Victoria Square Tower B Tangerang Banten. Jurnal Teknik Sipil, 25(2), 103. https://doi.org/10.5614/jts.2018.25.2.3

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free