Optimising the long term mine landform progression and truck hour schedule in a large scale open pit mine using mixed integer programming

2Citations
Citations of this article
14Readers
Mendeley users who have this article in their library.
Get full text

Abstract

A mine landform progression plan can provide a clear outlook of the entire mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or tonnage) and the allocated dumping location. However, current practise mainly focuses on the ore production, over-simplifying the waste material scheduling. As a result, a rock dump is often treated as a single point in long term planning, making it difficult to predict the progression pattern over the life of mine. Without such a guidance, it is almost impossible to carry out progressive rehabilitation of the waste rock dumps. The lack of dumping schedule could cause delay in development construction, i.e., tailing storage facility (TSF) and ROM-pad. Other downstream effect due to the over-simplification is inaccurate estimation of required truck hours, which could have huge financial impact on the operation. In this paper, mixed integer programming (MIP) models of different objective functions, i.e., maximise truck productivity by minimising the overall haulage distance, minimise required truck deviation between adjacent years, and a hybrid between the two objectives, are utilised to generate the long term optimum rock placement schedules under the criteria of satisfying site specific conditions. All three MIP models are implemented in a large scale open pit mine. The numerical solutions from the models forms three different rock placement schedules, based on which, the yearly truck requirements are easily calculated and compared. The graphical results show the three corresponding landform progression patterns over the life of mine, providing the optimised long term forecast of the operation.

Cite

CITATION STYLE

APA

Li, Y., Topal, E., & Ramazan, S. (2018). Optimising the long term mine landform progression and truck hour schedule in a large scale open pit mine using mixed integer programming. In Advances in Applied Strategic Mine Planning (pp. 669–686). Springer International Publishing. https://doi.org/10.1007/978-3-319-69320-0_39

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free