Parametric estimation

7Citations
Citations of this article
35Readers
Mendeley users who have this article in their library.
Get full text

Abstract

With advancements in computers and computer software, better control of project costs and construction duration can be maintained by contractors and owners. A great deal of software is now available to deal with tracking, scheduling, and detail estimating of construction projects. However, there are few programs available to generate a cost estimate from minimal details. Parametric estimation structures the detailed line items of completed projects into smaller groupings, or assemblies, with a relationship to known variables, or parameters. Through these parameters, such as gross square footage or length of pipe, a new detailed estimate can be generated from an old estimate. There are many uses for this type of estimating process. An estimator might use this approach as a quick check on a final estimate to confirm that no major cost items have been neglected. Parametric estimating can also be used to generate detail for the early stages of design when there is no formal design drawn on paper. With the use of multiple construction systems (assemblies), the estimator can perform a value analysis on the different systems to decide which is the lowest-costing system.

Cite

CITATION STYLE

APA

Melin, J. B. (1994). Parametric estimation. Cost Engineering (Morgantown, West Virginia), 36(1), 19–24. https://doi.org/10.2307/2284262

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free