Diretrizes para processo de projeto de fachadas com painéis pré-fabricados de concreto em ambiente BIM

  • El Debs L
  • Ferreira S
N/ACitations
Citations of this article
39Readers
Mendeley users who have this article in their library.

Abstract

Este artigo expõe as diretrizes para a criação de um processo de elaboração de projetos que utilizam painéis pré-fabricados de fachada, tendo como base o ambiente de Building Information Modeling (BIM). Os painéis pré-fabricados arquitetônicos de concreto (PPAC) foram utilizados como ponto de partida para a estruturação da proposta. A lógica de montagem justifica esta abordagem: assim como no sistema construtivo pré-fabricado, em que as peças são construídas fora do canteiro e chegam a este no momento da montagem, em BIM, os componentes da indústria da Arquitetura, Engenharia e Construção (AEC) são modelados independentemente e inseridos no momento oportuno no modelo. Foram realizados estudos teóricos sobre as características dos PPACs, seguidos de consulta a profissionais experientes do setor, para confirmação da seleção de dados e procedimentos necessários para o projeto. Em seguida, elaboraram-se fluxogramas de orientação para o processo de projeto. Uma simulação do procedimento proposto foi feita com o programa Revit 2013, para validação. A proposta procura auxiliar o projetista a definir os passos de projeto, bem como os dados para a modelagem dos elementos. Ao auxiliar projetistas a conceber projetos utilizando elementos pré-fabricados, procura-se facilitar e estimular seu uso mais frequente no país.This paper presents guidelines for the development of a design process for projects using precast façade panels, within a Building Information Modelling (BIM) environment. Precast concrete architectural panels (PCAP) were chosen as the starting point for structuring the proposal. The assembly logic justifies this approach: just as in the precast building system where the pieces are manufactured away from the construction site and are brought to it at the time of installation, in BIM, the elements and components of the Architectural, Engineering and Construction (AEC) industry are independently modelled and added to the model as and when required. Theoretical studies about the characteristics of PCAPs were conducted. That was followed by consultations with experienced professionals in the field to confirm the data selection and the necessary procedures for the design. Thereafter, flowcharts were made to guide the design process. A simulation of the new procedures was performed using the Revit 2013 software for validation. The proposal seeks to aid designers to define the necessary design steps, as well as the data used for modelling the elements. Helping designers to conceive designs using precast elements should stimulate and facilitate the use of precast components in Brazil.

Cite

CITATION STYLE

APA

El Debs, L. de C., & Ferreira, S. L. (2014). Diretrizes para processo de projeto de fachadas com painéis pré-fabricados de concreto em ambiente BIM. Ambiente Construído, 14(2), 41–60. https://doi.org/10.1590/s1678-86212014000200004

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free