Analisis Persediaan Bahan Baku Usaha Tempe Risky Di Desa Serumbung Kabupaten Bengkulu Utara

  • Astuti R
  • Fitriano Y
  • Afriani S
N/ACitations
Citations of this article
24Readers
Mendeley users who have this article in their library.

Abstract

The purpose of this study was to analyze the supply of raw materials for the Tempe Risky business in Serumbung Village, North Bengkulu Regency. The analytical method used is Economical Order Quantity (EOQ), Total Cost (TC), Re Order Point (ROP), and Safety Stock (SS). The results showed that to meet the need for raw material supplies of 336 sacks during the research period, from January 2021 to December 2021 (2021), the number of purchases that were Economical / EOQ of soybean raw materials had to be carried out by the Tempe Risky Business in Serumbung Village. North Bengkulu Regency is a total of 6 sacks per order with a frequency of 56 orders in one period from January 2021 to December 2021. Reordering or Re-Order Point (ROP) can also be determined, namely reordering should be done when the inventory is in warehouse as much as 4 sacks, with a lead time of 2 days so as not to hamper the company's production process. Total Cost can also be determined, namely the total cost of raw material inventory Rp. 55,456,650, - so that it can save on inventory costs of Rp. 163.643.350,- Safety Stock (SS) of 2 sacks that must be in the warehouse, this is intended so that there is no shortage of soybean raw materials if there is a delay in the delivery of raw materials.

Cite

CITATION STYLE

APA

Astuti, R., Fitriano, Y., & Afriani, S. (2023). Analisis Persediaan Bahan Baku Usaha Tempe Risky Di Desa Serumbung Kabupaten Bengkulu Utara. EKOMBIS REVIEW: Jurnal Ilmiah Ekonomi Dan Bisnis, 11(1). https://doi.org/10.37676/ekombis.v11i1.3294

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free