The comparison between two control methods about simulation of traction load

0Citations
Citations of this article
1Readers
Mendeley users who have this article in their library.
Get full text

Abstract

This paper proposed an enhanced solution, which adopted ways of changing methods for controlling current on inverter side, adding practical current after enabling D-Q transform and adopting triangular carrier control instead of hysteresis control, for simulating traction loads based on PWM converter. Simulation result figured that increasingly close loops on inverter side and reduction on the risk of instability may be caused by exceeded switch frequency, comparing with existing solution using hysteresis and direct current control, can be achieved in the advantages of solution proposed in this paper. Therefore, energy saving and better traction load simulating have been implemented. © 2012 Springer-Verlag GmbH.

Cite

CITATION STYLE

APA

Hu, J., Xu, M., Guo, K., & Cui, Y. (2012). The comparison between two control methods about simulation of traction load. In Advances in Intelligent and Soft Computing (Vol. 115 AISC, pp. 737–744). https://doi.org/10.1007/978-3-642-25349-2_98

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free