Failure Investigation of under Construction Prestressed Concrete Bridge in Chitwan, Nepal

5Citations
Citations of this article
24Readers
Mendeley users who have this article in their library.

Abstract

On 6 April 2021, a 200 m-long under-construction prestressed concrete bridge failed in the Chitwan District in central Nepal. Two of the four bridge spans collapsed without any notable evidence of dynamic force application. Under-construction bridge failures are sometimes reported and can have a significant impact on the future construction adjustments. Thus, a detailed study of failure mechanisms will be insightful for the structural engineering community. Aiming to document the failure modes and exemplify lessons for improvement, this paper reports the detailed component level failure mechanisms of the bridge using visual inspection, site measurements, finite element modeling, and some forms of non-destructive testing. The chronological failure mechanisms are presented based on the field evidence and juxtaposed with the results of analytical modeling. The sum of findings highlights that the dead load failure, triggered by the settlement of falseworks, is the most critically governing factor that initiated and aggravated the damage scenario.

Cite

CITATION STYLE

APA

Adhikari, R., Jha, P., Bhatt, L., Thapa, D., Forcellini, D., & Gautam, D. (2022). Failure Investigation of under Construction Prestressed Concrete Bridge in Chitwan, Nepal. Infrastructures, 7(2). https://doi.org/10.3390/infrastructures7020014

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free