Dynamic workshop scheduling and control based on a rule-restrained colored petri net and system development adopting extended B/S/D mode

0Citations
Citations of this article
7Readers
Mendeley users who have this article in their library.
Get full text

Abstract

Because of the dynamic characteristics of a manufacturing system, long-term production plan and schedule are not feasible, neither is complete analysis of the manufacturing system and process in advance. In the paper, after the gap between theoretic researches and practical applications of workshop scheduling is analyzed, the hierarchical framework of agile manufacturing oriented workshop scheduling and control based on MAS is put forward. According to practical application requirements, traditional Petri net is expanded and RCPN is put forward to model workshop activities. Then, the architecture of workshop scheduling system based on RCPN is presented. Finally, the scheduling system that adopts 3-layer B/S/D mode is developed on Internet/Intranet by using Web database and Java The application of the system developed has been used at machine tool large parts workshop of Shaanxi Qinchuan Machinery Development Co., Ltd and the system has been proved to be effective. © Springer-Verlag Berlin Heidelberg 2006.

Cite

CITATION STYLE

APA

Yan, C., Ning, L., Yanjun, G., Hua, C., & Rujia, Z. (2006). Dynamic workshop scheduling and control based on a rule-restrained colored petri net and system development adopting extended B/S/D mode. In Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics) (Vol. 3842 LNCS, pp. 702–708). Springer Verlag. https://doi.org/10.1007/11610496_95

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free