Production scheduling optimization of prefabricated building components based on DDE algorithm

16Citations
Citations of this article
27Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

At present, the prefabricated construction industry is in a situation of increasing types of prefabricated components and generally high production costs. A hybrid optimization model considering continuity and discreteness for the production of fabricated concrete members is established to minimize production costs through the analysis of the production characteristics of precast concrete members. Under the premise of fully considering the staffing constraints, process constraints, construction period constraints, process constraints, and special process time limits for component production, the production arrangement and staffing of the components are rationalized and optimized. A discrete differential evolution (DDE) algorithm is introduced for such NP-hard problems. The double genetic chromosome coding mode and the active scheduling decoding method are adopted. Based on the improved POX (Precedence Operation Crossover) cross-evolution method, the global evolution operation is carried out, and an interchange-based local search method and continuous work penalty mechanism are designed to find the global optimal solution. The experimental results verify the practicality and effectiveness of the optimization model and algorithm.

Cite

CITATION STYLE

APA

Chang, C., & Han, M. (2021). Production scheduling optimization of prefabricated building components based on DDE algorithm. Mathematical Problems in Engineering, 2021. https://doi.org/10.1155/2021/6672753

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free