Comparing the cost of rigid and flexible aircraft pavements using a parametric whole of life cost analysis

10Citations
Citations of this article
31Readers
Mendeley users who have this article in their library.

Abstract

The construction and maintenance costs, as well as the residual value, were calculated for structurally equivalent rigid and flexible airfield pavements, for a range of typical commercial air-craft, as well as a range for typical subgrade conditions. Whole of life cost analysis was performed for a range of analysis periods, from 40 years to 100 years. For the standard 40-year analysis period and a residual value based on rigid pavement reconstruction, the rigid pavements had a 40% to 105% higher whole of life cost than equivalent flexible pavements, although this comparison is limited to the pavement compositions and material cost rates adopted. However, longer analysis periods had a significant impact on the relative whole of life cost, although the rigid pavements always had a higher cost than the flexible pavements. The assumed condition of the rigid pavement at the end of the design life was the most influential factor, with a 60-year service life resulting in the rigid pavements having a lower whole of life cost than the flexible pavements, but assuming a require-ment for expedient rigid pavement reconstruction resulted in the rigid pavements costing approxi-mately 4–6 times the cost of the flexible pavements over the 40-year analysis period.

Cite

CITATION STYLE

APA

White, G. (2021). Comparing the cost of rigid and flexible aircraft pavements using a parametric whole of life cost analysis. Infrastructures, 6(8). https://doi.org/10.3390/infrastructures6080117

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free