Oversizing analysis of HVAC system in prototypical commercial buildings

1Citations
Citations of this article
6Readers
Mendeley users who have this article in their library.
Get full text

Abstract

Oversizing of heating ventilation and air-conditioning equipment becomes an intractable fault once the building system is designed and constructed. It imposes control challenges, impacts the indoor air condition, increases energy consumption, and reduces the equipment life span. As a system-level fault, it is difficult to duplicate and quantify in an experimental environment. This study analyzes the oversizing issues in prototypical commercial buildings. Data of system operations from 12 retail stores in different climatic regions in the US are collected. We applied three parameters, including cycling number, run-time fraction, and maximum cycling number, to capture the oversizing signature of a RTU based on the annual design conditions. Two different effective dead-band temperatures are adopted to evaluate the potential uncertainty. The findings can be used to assess the oversizing level of RTUs, quantify the average energy penalty of sample buildings, and guide future design. More importantly, the methodology can be automated and applied in smart building management systems for soft-repairing of an oversizing issue. © Springer-Verlag Berlin Heidelberg 2014.

Cite

CITATION STYLE

APA

Yu, Y., Li, H., Woradechjumroen, D., & Yu, D. (2014). Oversizing analysis of HVAC system in prototypical commercial buildings. In Lecture Notes in Electrical Engineering (Vol. 263 LNEE, pp. 487–498). https://doi.org/10.1007/978-3-642-39578-9_51

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free