Several tables and charts are presented which summarize a study made of schedule slippage of all plants ordered in the USA from January 1, 1965 through September 1974. The charts show how the targets eroded constantly over the years and where the growth estimate stood in the third quarter of 1974. It is shown that realization in 1968-75 will be a fraction of the original plans.
CITATION STYLE
Olds, F. C. (1975). NUCLEAR POWER ENGINEERING. Power Engineering (Barrington, Illinois), 79(1), 16–17. https://doi.org/10.13182/nse63-a28900
Mendeley helps you to discover research relevant for your work.