Risk Management of Pile Foundation Work Using Analytical Hierarchy Process Method (AHP)

  • Alitra
  • Bestari R
  • Purwoko K.B B
N/ACitations
Citations of this article
9Readers
Mendeley users who have this article in their library.

Abstract

Risk factors as the cause of the condition are not expected to cause any harm, damage or loss. The measure of risk based on the probability of failure of structural and monetary consequences of failure, and accounts for the material damage from time to time. The purpose of this study was to determine the factors (events that enable the) risk on pile foundation work and determine the weight/risk priority ranking of pile foundation work execution. This study uses analysis Analytical Hierarchy Process (AHP) to obtain risk factors pile foundation dominant conveyor manufacturing building consisting of 21 risk factors (criteria). The risk assessment carried out by 5 (five) Expert. The results in getting the expert assessment of the risk factors pile foundation work of the most dominant is the criterion of cost control systems are a weak and weak time control system.

Cite

CITATION STYLE

APA

Alitra, Bestari, R., & Purwoko K.B, B. (2019). Risk Management of Pile Foundation Work Using Analytical Hierarchy Process Method (AHP). International Journal of Engineering Research and Advanced Technology, 5(5), 37–46. https://doi.org/10.31695/ijerat.2019.3445

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free