Potensi PLTS Hybrid di PT. Makmur Indah Selaras International Muaro Jambi

  • Suprapto E
  • Djufri S
  • Hendi H
N/ACitations
Citations of this article
6Readers
Mendeley users who have this article in their library.

Abstract

Renewable energy that is suitable for the tropical climate in Indonesia with an average solar radiation of 4.8 kwh/m2 per day is the use of photovoltaics or solar cells. To use solar cells, they can be placed on the roof of a building to save existing land, such as at PT. Makmur Indah Selaras International. The research method uses direct observation and literature study to obtain data on the use of solar panels at the factory. Meanwhile, the aim of this research was to see the utilization of existing PLTS with a hybrid system at PT. Makmur Indah Selaras Internasional, which is one of the palm oil factories operating in Muaro Regency, Jambi.

Cite

CITATION STYLE

APA

Suprapto, E., Djufri, S. U., & Hendi, H. (2024). Potensi PLTS Hybrid di PT. Makmur Indah Selaras International Muaro Jambi. Journal of Electrical Power Control and Automation (JEPCA), 6(1), 5. https://doi.org/10.33087/jepca.v6i1.101

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free