Documentation management system for construction control at a transport construction site

0Citations
Citations of this article
8Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

The article shows the role of construction control in the construction of transport construction objects. The necessity of its implementation, starting from the early stages of construction, is justified. Reviewed a detailed list of accounting documents for carrying out construction supervision on objects of transport construction. For each document, the procedure for its preparation and frequency of submission to the customer or representatives of the contractor are described. A detailed list of reporting documents on construction supervision at transport construction facilities is considered, including conclusions on the verifiability of design and working documentation for the transport construction object, conclusion on the readiness of contractors to perform construction, reconstruction, capital repairs, conclusion on the readiness of the construction laboratory of the nondestructive testing laboratory, electrical laboratory, within the framework of the construction contractor's activities, when performing construction, reconstruction, capital repairs, conclusion on conformity assessment is made of the object and its willingness to carry out the work of the Commission, preparation of General journal and construction supervision, charting object, act, visual-measuring control, weekly and monthly reports, act of acceptance-transmission equipment (materials) on the project of the act on the identified equipment defects (materials), reference for the audit and approval of acts examination of the hidden works, draw conclusions about the dynamics of performance., preparation of a report on the actual time of rendering construction control services at the customer's facility. The article presents an algorithm for document management based on the assessment of the work of several enterprises, which allows for high-quality construction control on construction sites.

Cite

CITATION STYLE

APA

Perunov, A. S., & Baulin, A. V. (2020). Documentation management system for construction control at a transport construction site. In IOP Conference Series: Materials Science and Engineering (Vol. 918). IOP Publishing Ltd. https://doi.org/10.1088/1757-899X/918/1/012006

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free