Fecal sludge treatment in a pilot-scale vertical-flow constructed wetland for the removal of helminth eggs

4Citations
Citations of this article
21Readers
Mendeley users who have this article in their library.

Abstract

Eliminating parasites in fecal sludge (FS) remains one of the major concerns in developing countries. To address this issue, experiments were conducted in triplicate vertical-flow constructed wetland (VFCW) units corresponding to free flow, 7 days and 14 days of retention time (RT). The effect of plant density on the system’s performance was monitored in each planted bed unit and compared to the non-planted unit (stan-dard). Following a bi-monthly application rate of FS at a nominal load of 200 kg TS m2 year1, the performance of the system in terms of helminth egg removal was calculated for each hydraulic RT tested. Untreated FS applied on the bed units contained high parasitic egg loads with a median number of 62.51 helminth eggs/g. The removal efficiencies of helminth eggs ranged from 82 to 100% in the leachates and were affected by the hydraulic RTs and the presence of plants (p, 0.05). On the other hand, accumulated biosolids on the bed units still contained high concentrations of pathogens exceeding the WHO standards and should not be applied directly in agriculture.

Cite

CITATION STYLE

APA

Nzouebet, W. A. L., Kengne, E. S., Rechenburg, A., Ndangang, J. J. N., & Noumsi, I. M. K. (2022). Fecal sludge treatment in a pilot-scale vertical-flow constructed wetland for the removal of helminth eggs. Journal of Water Sanitation and Hygiene for Development, 12(9), 634–646. https://doi.org/10.2166/washdev.2022.090

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free