Improved fully polynomial approximation schemes for the maximum lateness minimization on a single machine with a fixed operator or machine non-availability interval

1Citations
Citations of this article
1Readers
Mendeley users who have this article in their library.
Get full text

Abstract

In this paper we consider the single machine scheduling problem with one non-availability interval to minimize the maximum lateness where jobs have positive tails. Two cases are considered. In the first one, the non-availability interval is due to the machine maintenance. In the second case, the non-availibility interval is related to the operator who is organizing the execution of jobs on the machine. The contribution of this paper consists in an improved FPTAS for the maintenance non-availability interval case and its extension to the operator non-availability interval case. The two FPTASs are strongly polynomial and outperform the recent ones by Kacem, Kellerer and Seifaddini presented in [12].

Cite

CITATION STYLE

APA

Kacem, I., & Kellerer, H. (2018). Improved fully polynomial approximation schemes for the maximum lateness minimization on a single machine with a fixed operator or machine non-availability interval. In Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics) (Vol. 11184 LNCS, pp. 417–427). Springer Verlag. https://doi.org/10.1007/978-3-030-00898-7_28

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free