The Potential of Hydrokinetic Energy Harnessing in Pahang River Basin

1Citations
Citations of this article
12Readers
Mendeley users who have this article in their library.
Get full text

Abstract

This paper focuses on studying the potential of the hydrokinetic energy harnessing along the longest river in Peninsular Malaysia, which is the Pahang River. The data such water discharge and water depth on ten selected sites at the Telemetry Gauging Station (GS) owned by Department of Drainage and Irrigation, Malaysia (DID) have been used for the assessment of hydrokinetic potentials. The Flow Duration Curve (FDC) at the potential site has been plotted to analyse the Q50. This assessment study indicated that the two rivers along the Pahang River basin have a significant potential for hydrokinetic energy harnessing. Subsequently, four different types of turbines with different size and power coefficient (Cp) has been used to calculate the output power and total annual energy yield. The estimated annual energy yield for Sg. Pahang at Lubuk Paku is ranging from 69.5 to 173.7 MWh. Whereas Sg. Pahang at Temerloh is between 45.54 and 113.8 MWh per year.

Cite

CITATION STYLE

APA

Ibrahim, W. I., Mohamed, M. R., & Ismail, R. M. T. R. (2022). The Potential of Hydrokinetic Energy Harnessing in Pahang River Basin. In Lecture Notes in Electrical Engineering (Vol. 770, pp. 1163–1176). Springer Science and Business Media Deutschland GmbH. https://doi.org/10.1007/978-981-16-2406-3_85

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free