Temperature crack control analysis for pedestal in jinping-1 high arch dam engineering

1Citations
Citations of this article
3Readers
Mendeley users who have this article in their library.
Get full text

Abstract

The feasibilities of temperature control and crack prevention measures in different seasons are researched based on the mass concrete construction simulation of the left bank pedestal in Jinping-1 high arch dam engineering. Pipe cooling is simulated by equivalent method in the computation, the influence of surface heat preservation, parting and some other factors are considered at the same time. The results show the main temperature control project of different seasons is reasonable and feasible. The opening of joints is judged and some suggestions on temperature control and crack prevention are made in the conclusion. © 2008 Science Press Beijing and Springer-Verlag GmbH Berlin Heidelberg Geotechnical Engineering for Disaster Mitigation and Rehabilitation.

Cite

CITATION STYLE

APA

Qiang, S., Zhu, Y., Hu, T., & Shao, Z. (2008). Temperature crack control analysis for pedestal in jinping-1 high arch dam engineering. In Geotechnical Engineering for Disaster Mitigation and Rehabilitation - Proceedings of the 2nd International Conference GEDMAR08 (pp. 735–741). Springer-Verlag GmbH and Co. KG. https://doi.org/10.1007/978-3-540-79846-0_93

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free