A Heuristic Approach for a Multistage Lotsizing Problem with Dynamic Product Structure

  • Alicke K
  • Eley M
  • Hahne T
  • et al.
N/ACitations
Citations of this article
3Readers
Mendeley users who have this article in their library.
Get full text

Abstract

We consider a multistage lotsizing problem with capacity-constrained resources, general product structures and nonzero lead times. This problem is motivated by a real-life application from a large manufacturer of electronic devices and deals with the determination of a production plan for the end items and their components to meet external prioritized demand in each period of a given planning horizon. Since resources are scarce, the main objective is to obtain a production plan that minimizes the total number of late orders. The problem is substantially complicated by a number of side-constraints that arise in many industrial settings. In addition, as a result of short product life cycles, the bill-of-materials (BOM) has a dynamic structure meaning that components are replaced by new ones during the planning horizon. Since real-life problems are too hard to solve optimally in reasonable computing time, one is compelled to use heuristic solution methods. We propose a two-step greedy heuristic which first generates a solution to the uncapacitated version of the problem. In the second step, capacity feasibility is attained by shifting production of product sub-structures backward and forward in time.

Cite

CITATION STYLE

APA

Alicke, K., Eley, M., Hahne, T., & Melo, T. (2001). A Heuristic Approach for a Multistage Lotsizing Problem with Dynamic Product Structure (pp. 278–283). https://doi.org/10.1007/978-3-642-56656-1_43

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free