ANALYSIS OF COST CONTROL, TIME, AND QUALITY ON CONSTRUCTION PROJECT

  • Nusraningrum D
  • Priyono J
N/ACitations
Citations of this article
47Readers
Mendeley users who have this article in their library.

Abstract

This research aims to analyze the relationship of delay time and costs with estimated that causes increased costs from perspective of management fees project with earned value method and to analyze the influence of the variables associated with the quality control at each stage of the work concreting. Secondary data collection i.e. the draft budget, the curve S, financing and weekly reports the progress of the project. Primary data i.e. questionnaires to 30 respondents. The cost control and time used earned value methods, and quality control with multiple linear regression. The results of the research project performance until the 27th week of aspects of cost and time projects implementation are not experiencing excess costs, but suffered delays. Regression analysis a very influential determinant variables of each job of making concrete to install formwork: concrete level marking and dimensions for formwork, ironing: the connection reinforcement iron and iron a clean free from rust, oil, and dry concrete, for concreting: checking of slump test and the amount of labor, and to uninstall the formwork: concrete age and concrete level according to plan.

Cite

CITATION STYLE

APA

Nusraningrum, D., & Priyono, J. (2018). ANALYSIS OF COST CONTROL, TIME, AND QUALITY ON CONSTRUCTION PROJECT. Journal of Management and Business, 17(1). https://doi.org/10.24123/jmb.v17i1.364

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free