Selecting efficient lining method is very important for tunnel safety and serviceability. Selection of lining methods is controlled by technical and non-technical factors. Technical factors represent the project conditions such as ground condition and tunnel shape, etc. Non-technical factors are cost and time. This paper introduces a model that can be used for selecting efficient lining methods for tunnels in the preliminary stage of the project.
CITATION STYLE
Toma, H. (2012). Tunnel Lining Methods: Selection of an efficient method. International Journal of Advanced Technology in Civil Engineering, 14–20. https://doi.org/10.47893/ijatce.2012.1003
Mendeley helps you to discover research relevant for your work.