A hybrid heuristic algorithm for ship block construction space scheduling problem

10Citations
Citations of this article
11Readers
Mendeley users who have this article in their library.

Abstract

Ship block construction space is an important bottleneck resource in the process of shipbuilding, so the production scheduling optimization is a key technology to improve the efficiency of shipbuilding. With respect to ship block construction space scheduling problem, a hybrid heuristic algorithm is proposed in this paper. Firstly, Bottom-Left-Fill (BLF) process is introduced. Next, an initial solution is obtained by guiding the sorting process with corners. Then on the basis of the initial solution, the simulated annealing arithmetic (SA) is used to improve the solution by offering a possibility to accept worse neighbor solutions in order to escape from local optimum. Finally, the simulation experiments are conducted to verify the effectiveness of the algorithm.

Cite

CITATION STYLE

APA

Hu, S., Liu, T., Wang, S., Kao, Y., & Sun, X. (2015). A hybrid heuristic algorithm for ship block construction space scheduling problem. Discrete Dynamics in Nature and Society, 2015. https://doi.org/10.1155/2015/841637

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free