Scheduling of Dual-Arm Multi-tool Assembly Robots and Workspace Layout Optimization

2Citations
Citations of this article
3Readers
Mendeley users who have this article in their library.
Get full text

Abstract

The profitability of any assembly robot installation depends on the production throughput, and to an even greater extent on incurred costs. Most of the cost comes from manually designing the layout and programming the robot as well as production downtime. With ever smaller production series, fewer products share this cost. In this work, we present the dual arm assembly program as an integrated routing and scheduling problem with complex arm-to-arm collision avoidance. We also present a set of high-level layout decisions, and we propose a unified CP model to solve the joint problem. The model is evaluated on realistic instances and real data. The model finds high-quality solutions in short time, and proves optimality for all evaluated problem instances, which demonstrates the potential of the approach.

Cite

CITATION STYLE

APA

Wessén, J., Carlsson, M., & Schulte, C. (2020). Scheduling of Dual-Arm Multi-tool Assembly Robots and Workspace Layout Optimization. In Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics) (Vol. 12296 LNCS, pp. 511–520). Springer Science and Business Media Deutschland GmbH. https://doi.org/10.1007/978-3-030-58942-4_33

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free