A Study on Development of BIM-based Asset Management Model for Maintenance of the Bridge

  • Kang J
  • Lee D
  • Park J
  • et al.
N/ACitations
Citations of this article
11Readers
Mendeley users who have this article in their library.

Abstract

The most of domestic bridge has an used life under 30 years, Future maintenance budgets can be expected to increase. However, because of bridge maintenance budgets are limited, demand for asset management being performed to achieve required performance within available budget is increasing. To perform effective asset management of bridges should be made the best use of information to occur in all phase of construction project. Therefore, the development of system and DB is required to support asset management by effective information management. The objective of this study is the development of the BIM-based bridge asset management model. Through previous research survey, BIM capabilities and asset management components were established and mutual linkages were examined. Bridge asset management model was composed of alternate assessment model. In addition, BIM-based asset management model was performed case studies to verify feasibility and applicability. The proposed model can be applied to a current bridge maintenance procedures and supported to perform effective bridge maintenance tasks within a limited budget.

Cite

CITATION STYLE

APA

Kang, J.-M., Lee, D.-Y., Park, J.-B., & Lee, M.-J. (2012). A Study on Development of BIM-based Asset Management Model for Maintenance of the Bridge. Korean Journal of Construction Engineering and Management, 13(5), 3–11. https://doi.org/10.6106/kjcem.2012.13.5.003

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free