Analysis of indicators and cost of world class maintenance (WCM) in forest machines

2Citations
Citations of this article
19Readers
Mendeley users who have this article in their library.

Abstract

The study was carried out at a forest company located in the Paraná State, Brazil, with the feller buncher, skidder and harvester. The following indicators were evaluated: mechanical availability, mean time between failures, mean time to repair, proactive maintenance index and maintenance costs, based on data obtained over a period of 18 months, contemplating the stages of implantation, maturation and stabilization of the WCM. The results showed an increase in the mechanical availability of the cutting and skidding machines from the implantation stage. The mean time between failures increased from the implantation stage, from 31.59 hours to 37.01 hours in the stabilization stage. As for the mean time to repairs, skidder and harvester presented an increase of 25.9% and 18.9% respectively; however, this increase in time represented an improvement in the quality of maintenance services, reflected in the results of mean time between failures. There was also a 31% increase in the proactive index of the machines studied, resulting in 9% reduction in maintenance costs between the deployment and stabilization stages.

Cite

CITATION STYLE

APA

Diniz, C. C. C., Lopes, E. da S., Miranda, G. de M., Koehler, H. S., & de Souza, E. K. C. (2019). Analysis of indicators and cost of world class maintenance (WCM) in forest machines. Floresta, 49(3), 533–542. https://doi.org/10.5380/rf.v49i3.60013

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free