Predicting project cost overrun levels in bidding stage using ensemble learning

11Citations
Citations of this article
82Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

Predicting project cost overruns in the bidding stage has undergone significant changes with the application of state-of-the-art techniques. Both modeling techniques and domain knowledge should be integrated to enhance predictions of cost performance. This study developed an ensemble-learning classification model to predict the expected cost-overrun levels of public projects and derive explanatory factors and key predictors. A database of 234 public-sector projects in South Korea was used, including project characteristics (i.e., project delivery method, project types, cost, and schedule) in combination with bidding characteristics (i.e., award method, number of bidders, bid to estimate ratio, number of joint ventures). The results yielded an average accuracy of 61.41% for five model runs. Furthermore, information on the project type being constructed is an important contributor to prediction accuracy. Results of the model enable project owners and managers to screen projects that are expected to incur excessive cost overruns and to anticipate budget loss during the bidding stage and before contracts are finalized.

Cite

CITATION STYLE

APA

Moon, H., Williams, T. P., Lee, H. S., & Park, M. (2020). Predicting project cost overrun levels in bidding stage using ensemble learning. Journal of Asian Architecture and Building Engineering, 19(6), 586–599. https://doi.org/10.1080/13467581.2020.1765171

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free