Optimal Scheduling of Integrated Community Energy Systems Based on Twin Data Considering Equipment Efficiency Correction Models

5Citations
Citations of this article
31Readers
Mendeley users who have this article in their library.

Abstract

The economics of integrated community energy system (ICES) dispatch schemes are influenced by the accuracy of the parameters of the different energy-conversion-equipment models. Traditional equipment efficiency correction models only take into account the historical load factors and variations in the environmental factors, ignoring the fact that the input data do not come from the actual operating data of the equipment, which affects the accuracy of the equipment models and therefore reduces the economics of ICES dispatch solutions. Therefore, this paper proposes an optimal scheduling of a community-integrated energy system based on twin data, considering a device-correction model that combines an energy hub model and a twin data correction model. Firstly, a dynamic energy hub (DEH) model with a correctable conversion efficiency is developed based on the twin data; secondly, a physical model of the system and a digital twin are established, with the prediction data as the input of the digital twin and the twin data as the output. Polynomial regression (PR) and a back propagation neural network (BPNNS) are used to process the twin data to accurately extract the equipment conversion efficiency. Considering the lack of accuracy of traditional prediction methods, a prediction model combining a long- and short-term-memory neural network and digital-twin technology is constructed for renewable energy generation and load prediction. The simulation results show that using twin data to correct the equipment efficiency reduces the average absolute error and average relative error by 4.6706 and 1.18%, respectively, when compared with the use of historical data. Compared with the actual total cost of the dispatch, the total cost of the dispatch after the equipment efficiency correction was reduced by USD 850.19.

References Powered by Scopus

Enabling technologies and tools for digital twin

1010Citations
N/AReaders
Get full text

Optimal Operation Analysis of Integrated Community Energy System Considering the Uncertainty of Demand Response

160Citations
N/AReaders
Get full text

A double-layer planning method for integrated community energy systems with varying energy conversion efficiencies

136Citations
N/AReaders
Get full text

Cited by Powered by Scopus

Overview of Digital Twins in Renewable Energy

5Citations
N/AReaders
Get full text

Production analytics for renewable energy portfolio management: A comparative study of active and passive strategies in digital twin

3Citations
N/AReaders
Get full text

Chance-Constrained Dispatching of Integrated Energy Systems Considering Source–Load Uncertainty and Photovoltaic Absorption

3Citations
N/AReaders
Get full text

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Cite

CITATION STYLE

APA

Ye, Z., Huang, W., Huang, J., He, J., Li, C., & Feng, Y. (2023). Optimal Scheduling of Integrated Community Energy Systems Based on Twin Data Considering Equipment Efficiency Correction Models. Energies, 16(3). https://doi.org/10.3390/en16031360

Readers' Seniority

Tooltip

PhD / Post grad / Masters / Doc 6

67%

Professor / Associate Prof. 1

11%

Lecturer / Post doc 1

11%

Researcher 1

11%

Readers' Discipline

Tooltip

Engineering 10

63%

Energy 3

19%

Business, Management and Accounting 2

13%

Decision Sciences 1

6%

Article Metrics

Tooltip
Mentions
Blog Mentions: 1

Save time finding and organizing research with Mendeley

Sign up for free