Cost and time analysis on the selection of formwork installation method

6Citations
Citations of this article
32Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

Formwork is a supporting tool for printing concrete of the desired size and shape. Choosing a certain type of formwork method will affect the time and cost of a project. There are two types of formwork method, the conventional method and the semi-system method. This research will compare the two methods on the cost, time and waste products on their application on beams, columns and slab of a construction building project. The aim of this research is to compare the cost, time and waste product of the two formwork method on a construction building project. A high rise construction building project with 24 floors will be used as a case study in this research. Based on this research it is found that the conventional system cost 12% more than the semi-system. It also needed 12 more days to finish and also produce 10% more waste than the semi-system.

Cite

CITATION STYLE

APA

Arumsari, P., & Xavier, C. (2020). Cost and time analysis on the selection of formwork installation method. In IOP Conference Series: Earth and Environmental Science (Vol. 426). Institute of Physics Publishing. https://doi.org/10.1088/1755-1315/426/1/012042

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free