Electric multiple unit circulation plan optimization based on the branch-and-price algorithm under different maintenance management schemes

4Citations
Citations of this article
16Readers
Mendeley users who have this article in their library.

Abstract

For railway operators, one of many important goals is to improve the utilization efficiency of electric multiple units (EMUs). When operators design EMU circulation plans, EMU type restrictions are critical factors when assigning EMUs to the correct depots for maintenance. However, existing studies only consider that EMUs are maintained at their home depots. However, targeting that problem, in this paper, an optimization model for the EMU circulation planning problem that allows depots to be selected for EMU maintenance is proposed. This model aims at optimizing the number of used EMUs and the number of EMU maintenance tasks and simultaneously incorporates other important constraints, including type restrictions, on EMU maintenance and night accommodation capacity at depots. In order to solve the model, a branch-and-price algorithm is also developed. A case study of a real-world high-speed railway was conducted to compare and analyze the effects of different maintenance location constraints. The results show that the number of EMUs used will decrease under the maintenance sharing scheme, the number of EMU maintenance tasks can be reduced, and the time occupied in EMU maintenance will be released. In addition, the scheme of maintenance resources sharing and increases to mileage limits can effectively decrease the number of EMU maintenance tasks significantly. The model and algorithm can be used as an effective quantitative analysis tool for railway operators’ decision-making processes in the EMU circulation planning problem.

References Powered by Scopus

Branch-and-price: Column generation for solving huge integer programs

1497Citations
N/AReaders
Get full text

Selected topics in column generation

777Citations
N/AReaders
Get full text

A primer in column generation

265Citations
N/AReaders
Get full text

Cited by Powered by Scopus

The shunting scheduling of EMU first-level maintenance in a stub-end depot

4Citations
N/AReaders
Get full text

Enabling Trust in Cross-Organisational Data Sharing for EMU Maintenance: A Double-Blockchain Solution

3Citations
N/AReaders
Get full text

EMU Route Plan Optimization by Integrating Trains from Different Periods

3Citations
N/AReaders
Get full text

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Cite

CITATION STYLE

APA

Li, W., Nie, L., & Zhang, T. (2018). Electric multiple unit circulation plan optimization based on the branch-and-price algorithm under different maintenance management schemes. PLoS ONE, 13(7). https://doi.org/10.1371/journal.pone.0199910

Readers' Seniority

Tooltip

PhD / Post grad / Masters / Doc 5

56%

Professor / Associate Prof. 2

22%

Lecturer / Post doc 1

11%

Researcher 1

11%

Readers' Discipline

Tooltip

Engineering 4

50%

Business, Management and Accounting 2

25%

Pharmacology, Toxicology and Pharmaceut... 1

13%

Computer Science 1

13%

Save time finding and organizing research with Mendeley

Sign up for free