Joint Simulations, Optimal Drillhole Spacing and the Role of the Stockpile

  • Boucher A
  • Dimitrakopoulos R
  • Vargas-Guzmán J
N/ACitations
Citations of this article
24Readers
Mendeley users who have this article in their library.
Get full text

Abstract

Infill and grade control drilling are a major cost in any mining operation. Reduction of drilling density can considerably enhance the profitability of an operation provided the cost from block misclassification is less than the savings in drilling. This paper presents a general simulation based approach to assess the performance of potential drilling schemes from the available deposit information. The approach integrates joint simulation of correlated variables with the computationally efficient minimum/maximum autocorrelation factors, multi-elements ore classification, and mine planning considerations. The latter employs key indicators such as profit per tonne mined and profit per tonne milled, as well as the potential use of a stockpile and its discounting. A case study at the Murrin Murrin nickel-cobalt deposit, Western Australia, is used to elucidate the proposed approach and to show the critical effect of planning decisions on drilling.

Cite

CITATION STYLE

APA

Boucher, A., Dimitrakopoulos, R., & Vargas-Guzmán, J. A. (2005). Joint Simulations, Optimal Drillhole Spacing and the Role of the Stockpile (pp. 35–44). https://doi.org/10.1007/978-1-4020-3610-1_4

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free