Solving Permutation Flow Shop Scheduling Problem with Sequence-Independent Setup Time

40Citations
Citations of this article
29Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

In this paper, we study the resolution of a permutation flow shop problem with sequence-independent setup time. The objective is to minimize the maximum of job completion time, also called the makespan. In this contribution, we propose three methods of resolution, a mixed-integer linear programming (MILP) model; two heuristics, the first based on Johnson's rule and the second based on the NEH algorithm; and finally two metaheuristics, the iterative local search algorithm and the iterated greedy algorithm. A set of test problems is simulated numerically to validate the effectiveness of our resolution approaches. For relatively small-size problems, it has been revealed that the adapted NEH heuristic has the best performance than that of the Johnson-based heuristic. For the relatively medium and large problems, the comparative study between the two metaheuristics based on the exploration of the neighborhood shows that the iterated greedy algorithm records the best performances.

Cite

CITATION STYLE

APA

Belabid, J., Aqil, S., & Allali, K. (2020). Solving Permutation Flow Shop Scheduling Problem with Sequence-Independent Setup Time. Journal of Applied Mathematics, 2020. https://doi.org/10.1155/2020/7132469

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free