Ion cyclotron resonance heating systems upgrade toward high power and CW operations in WEST

12Citations
Citations of this article
9Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

The design of the WEST (Tungsten-W Environment in Steady-state Tokamak) Ion cyclotron resonance heating antennas is based on a previously tested conjugate-T Resonant Double Loops prototype equipped with internal vacuum matching capacitors. The design and construction of three new WEST ICRH antennas are being carried out in close collaboration with ASIPP, within the framework of the Associated Laboratory in the fusion field between IRFM and ASIPP. The coupling performance to the plasma and the load-tolerance have been improved, while adding Continuous Wave operation capability by introducing water cooling in the entire antenna. On the generator side, the operation class of the high power tetrodes is changed from AB to B in order to allow high power operation (up to 3 MW per antenna) under higher VSWR (up to 2:1). Reliability of the generators is also improved by increasing the cavity breakdown voltage. The control and data acquisition system is also upgraded in order to resolve and react on fast events, such as ELMs. A new optical arc detection system comes in reinforcement of the Vr/Vf and SHAD systems.

Cite

CITATION STYLE

APA

Hillairet, J., Mollard, P., Zhao, Y., Bernard, J. M., Song, Y., Argouarch, A., … Yuan, S. (2015). Ion cyclotron resonance heating systems upgrade toward high power and CW operations in WEST. In AIP Conference Proceedings (Vol. 1689). American Institute of Physics Inc. https://doi.org/10.1063/1.4936512

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free