A two-stage flexible flowshop problem with deterioration

3Citations
Citations of this article
3Readers
Mendeley users who have this article in their library.
Get full text

Abstract

We study a scheduling problem under considering deterioration on a two-stage flexible flowshop of particular structure (parallel machines in the first stage and a single batching machine in the second stage). The deterioration of a job means that its processing time on the batching machine is dependent on its waiting time, i.e., the time between the completion of the job in the first stage and the start of the job in the second stage. The objective is to minimize the makespan plus the total penalty cost of batching-machine utilization ratio. First, we prove the problem is strongly NP-hard. An efficient heuristic algorithm for the general problem is constructed and its worst-case bound is analyzed. Computational experiments show that the heuristic algorithm performs well on randomly generated problem instances. © 2008 Springer-Verlag Berlin Heidelberg.

Cite

CITATION STYLE

APA

Gong, H., & Tang, L. (2008). A two-stage flexible flowshop problem with deterioration. In Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics) (Vol. 5092 LNCS, pp. 651–660). https://doi.org/10.1007/978-3-540-69733-6_64

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free