Improved Sub-gradient Algorithm for Solving the Lower Bound of No-Wait Flow-Shop Scheduling with Sequence-Dependent Setup Times and Release Dates

0Citations
Citations of this article
1Readers
Mendeley users who have this article in their library.
Get full text

Abstract

In this paper, three different lower bound models of the no-wait flow-shop scheduling problem (NFSSP) with sequence dependent setup times (SDSTs) and release dates (RDs) are proposed to minimize the makespan time criterion, which is a typical NP-hard combinatorial optimization problem. First, a mixed integer programming model for flow shop scheduling problems is proposed. Secondly, some variables and constraints are relaxed based on the model proposed in this paper. Thirdly, in order to improve the lower bound of this model, a Lagrangian relaxation (LR) model for the flow shop scheduling problem is designed and an improved subgradient algorithm is proposed to solve this problem. The algorithm simulation experiment shows the effectiveness of the algorithm proposed by the article about flow shop scheduling problem and can calculate a tight lower bound.

Cite

CITATION STYLE

APA

Yu, N. K., Hu, R., Qian, B., Zhang, Z. Q., & Wang, L. (2018). Improved Sub-gradient Algorithm for Solving the Lower Bound of No-Wait Flow-Shop Scheduling with Sequence-Dependent Setup Times and Release Dates. In Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics) (Vol. 10956 LNAI, pp. 93–101). Springer Verlag. https://doi.org/10.1007/978-3-319-95957-3_11

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free